Posted on Wednesday 1 July 2009
If you haven’t been to the Duluth Grill lately, there are some changes being done. As you enter the door to the right, there has been “some handy dandy carpentry” going on between the seats making them sleaker and more modern.
Outside blacktop touch ups are being done to fill in “the pot holes.” Lines maybe repainted.
In front of the two main windows some major concrete work has been done. All the rock was taken out ,and there is a concrete ledge on both sides that is maybe 6-7 inches high. Are you wondering what is going on those ledges? There will be large pots with “some green” in them. I am wondering what greenery we will see in them. We’ll have to see if it is flowers, shrubbery, herbs or bushes.